Cyberabad municipal corporation takes up road repairs, pothole works on August 19

Cyberabad municipal corporation takes up road repairs, pothole works on August 19 Published - August 19, 2026 11: 16 pm IST - HYDERABAD.

WorldNews Info Wire2 min read
Cyberabad municipal corporation takes up road repairs, pothole works on August 19

Cyberabad municipal corporation takes up road repairs, pothole works on August 19 Published – August 19, 2026 11: 16 pm IST – HYDERABAD.

Article outline

  1. What happened
  2. Official response
  3. The bottom line

Key points

  • While BT patches were attended to on Allapur Main Road in Moosapet Circle, pothole repairs were additionally carried out at Aditya Imperial Heights in Miyapur Circle.
  • In Tellapur Ward, repair works were carried out at Alien Junction, Mayfair Junction and Radial Road 30.
  • The Cyberabad Municipal Corporation (CMC) on Wednesday (August 19) took up road repair works at a number of locations.
  • While BT patches were repaired on the stretch between Mettukani Guda and Rajeev Gandhi Nagar, in Gajularamaram Circle, work was taken up on the badly damaged Lalsabguda Road.
  • Road repairs were additionally carried out on HCU Road in Serilingampally Circle.

For context, the Cyberabad Municipal Corporation (CMC) on Wednesday (August 19) took up road repair works at a number of locations. Photo Credit: @CMC_Offcl on X.

Notably, the Cyberabad Municipal Corporation (CMC) on Wednesday (August 19) took up road repair works at a number of locations, with engineering teams attending to potholes and damaged bituminous concrete (BT) and cement concrete (CC) stretches.

While BT patches were repaired on the stretch between Mettukani Guda and Rajeev Gandhi Nagar, in Gajularamaram Circle, work was taken up on the badly damaged Lalsabguda Road. In Ameenpur Circle, teams, along with the IRT, attended to potholes and damaged BT stretches in Bharti Nagar and RC Puram wards.

Road repairs were additionally carried out on HCU Road in Serilingampally Circle. In Madhapur Circle, teams attended to BT and CC patches and potholes in Anjaiah Nagar and Madhapur wards. BT patchwork was taken up in Central Park Colony in Kompally Ward.

In Tellapur Ward, repair works were carried out at Alien Junction, Mayfair Junction and Radial Road 30. While a CC pothole at JNTU Free Left in Vasantha Nagar, Ward 251, was repaired, in Kukatpally Circle, departmental BT cross-cutting works were attended to on Green Hills Main Road in Sevalal Nagar, Ward 253.

"Field teams were continuing to identify damaged road stretches and take up repairs on priority. The works are being monitored on the ground by engineering teams, " remarked CMC.

For now, cyberabad municipal corporation takes up road repairs, pothole works on August 19 remains the part of the story worth watching, and further updates are likely as more details are confirmed.

Leave a Reply

Your email address will not be published. Required fields are marked *