Govt Allocates Rs. 900 Million for Major Motorway Repairs

Notably, the administration has allocated Rs. 900 million to repair damaged sections of the Hazara Motorway after technical assessments identified a number of locations affected by road depressions and settlement.

TechnologyNews Info Wire3 min read
E-Challan System Launched on Major Motorway

Notably, the administration has allocated Rs. 900 million to repair damaged sections of the Hazara Motorway after technical assessments identified a number of locations affected by road depressions and settlement.

Article outline

  1. What happened
  2. The key numbers
  3. Why it matters
  4. The details
  5. The bottom line

Key points

  • Police Register Case Against Motorists for Drifting at Lahore Shopping Mall Oct 30, 2026 12: 11 pm.
  • Container Truck Gets Stuck Under Newly Constructed Flyover in KP Oct 30, 2026 4: 02 pm.
  • OPAI Electric Bikes Could Shortly Be Manufactured in Pakistan Oct 30, 2026 3: 30 pm.
  • Talal Chaudhry remarked the E-35 Hazara Motorway project began in 2015 and reached completion in 2018.
  • While complaints regarding road depressions and settlement surfaced in 2024, he remarked the two-year defect liability period concluded in 2020.

Minister of State for Interior Muhammad Talal Chaudhry informed the Senate on Friday that the administration had completed a technical assessment and kicked off remedial work on the affected sections. OPAI Electric Bikes Could Shortly Be Manufactured in Pakistan.

He was responding to a Calling Attention Notice moved by Senator Mohsin Aziz regarding the deteriorating condition of the newly constructed motorway and the safety risks and inconvenience facing commuters.

Talal Chaudhry remarked the E-35 Hazara Motorway project began in 2015 and reached completion in 2018. The project underwent feasibility assessments, technical evaluations and third-party inspections, including an assessment by an international firm.

While complaints regarding road depressions and settlement surfaced in 2024, he remarked the two-year defect liability period concluded in 2020. Technical teams identified around six to seven locations where these challenges had developed.

Notably, the minister additionally stated the matter had reached the Peshawar High Court, with the Khyber Pakhtunkhwa administration involved in the process. He remarked the technical study examined a number of feasible causes, including rock conditions, soil composition and topography, before the administration allocated Rs. 900 million for corrective work. Major Progress Created on Kashmir Chowk Underpass.

Talal Chaudhry remarked the repairs aimed to maintain the motorway's condition and ensure safe and smooth travel for commuters. He additionally offered to backing further inquiries if required and pressed lawmakers to allow the ongoing repair work to continue.

At the request of Senator Mohsin Aziz, the chair referred the matter to the relevant committee for further consideration. Stay Connected with ProPakistani.

Obtain the latest automobile news, car launches, bike reviews, videos and analysis wherever you prefer. Follow on Google Discover. Follow on Google News Join WhatsApp. See more ProPakistani stories in Google Search and Top Stories.

For now, govt Allocates Rs. 900 Million for Major Motorway Repairs remains the part of the story worth watching, and further updates are likely as more details are confirmed.

Leave a Reply

Your email address will not be published. Required fields are marked *