Rawalpindi Ring Road Set for October 28 Inauguration

Preparations are underway for the inauguration of the Rawalpindi Ring Road (RRR), with Punjab Chief Minister Maryam Nawaz projected to formally open the project on October 28 at the Banth Interchange on GT Road, the starting point of the route.

PoliticsNews Info Wire2 min read
Rawalpindi Ring Road Almost Complete as Final Work Continues

Preparations are underway for the inauguration of the Rawalpindi Ring Road (RRR), with Punjab Chief Minister Maryam Nawaz projected to formally open the project on October 28 at the Banth Interchange on GT Road, the starting point of the route.

Article outline

  1. What happened
  2. The key numbers
  3. Why it matters
  4. The bottom line

Key points

  • Toyota Recalls Over 100, 000 Vehicles Over Fire Risk Oct 22, 2026 12: 54 pm.
  • Here's How Much Vehicle Rates Are Anticipated to Drop Under New Auto Policy Oct 22, 2026 2: 10 pm.
  • Kashmir Chowk Underpass to Open Shortly Oct 21, 2026 9: 38 pm.
  • The 38.3-kilometre project has been completed along its main route, including four interchanges at Banth, Chak Beli Khan, Adiala and Chakri.
  • The Punjab Development Working Party (PDWP) has approved the third revised PC-I for the project, valued at Rs50.4 billion.

Notably, the 38.3-kilometre project has been completed along its main route, including four interchanges at Banth, Chak Beli Khan, Adiala and Chakri. Installation of the tolling booth system is projected to be completed before the opening. Punjab Launches Rs. 2 Trillion Plan With 162, 000 Jobs.

For context, the tolling system has been transferred to the Punjab Ring Road Authority (PRRA) under the One Network firm arrangement, with the authority responsible for its operation and maintenance.

In practice, the final interchange at Thalian, designed as a broad-based interchange, will be completed at a afterwards stage. For now, the Ring Road has been connected to the motorway route at Thalian without an interchange.

In practice, the Punjab Development Working Party (PDWP) has approved the third revised PC-I for the project, valued at Rs50.4 billion. It additionally includes the construction cost of the Thalian broad-based interchange. Stay Connected with ProPakistani.

Obtain the latest automobile news, car launches, bike reviews, videos and analysis wherever you prefer. Follow on Google Discover. Follow on Google News Join WhatsApp. See more ProPakistani stories in Google Search and Top Stories.

Taken together, the developments around rawalpindi Ring Road Set for October 28 Inauguration point to a situation that is still moving, and the coming days should bring more clarity.

Leave a Reply

Your email address will not be published. Required fields are marked *