Tesla Finally Revealing Second-Gen Roadster After Nine Years
Tesla appears ready to finally unveil the long-delayed second-generation Roadster, almost nine years after the electric sports car was first unveiled.
Tesla appears ready to finally unveil the long-delayed second-generation Roadster, almost nine years after the electric sports car was first unveiled.
Article outline
- What happened
- Why it matters
- Background
- The details
- The bottom line
Key points
- Underage Driver Kills 12-Year-Old Girl in Karachi Road Accident Sep 14, 2026 1: 29 pm.
- Wall Collapses During Inauguration of Road Project in Peshawar Sep 14, 2026 1: 24 pm.
- Huawei Launches New EV Battery With 2, 000 Mile Range on Just 5-Minute Charge.
- That would put actual production well into 2027 or even 2028 if Tesla maintains that timeline.
- Add ProPakistani to Preferred Sources and see more of our stories in Google Search and Top Stories.
In a post on X, Tesla wrote "Go for launch" alongside an image showing the date 10.01, strongly pointing to an October 1 reveal. SpaceX Thrusters Could Be Part of the Reveal.
In practice, the teaser graphic additionally appears to reference the optional cold-gas thrusters Tesla has previously discussed for the Roadster.
In practice, the system is being developed with technology from SpaceX and is projected to provide extreme acceleration and potentially allow the vehicle to briefly lift off the ground in some form.
Tesla CEO Elon Musk has repeatedly described the next Roadster as something that will go far beyond a conventional sports car.
Goodbye Tesla? Huawei Launches New EV Battery With 2, 000 Mile Range on Just 5-Minute Charge. Go for launch pic.twitter.com/Khu03eiZ04. Tesla (@Tesla) September 12, 2026. First Confirmed in 2017.
Tesla originally unveiled the second-generation Roadster in November 2017, promising extraordinary acceleration and range. The vehicle has since been delayed multiple times.
Some customers have been waiting for years after placing sizeable reservation deposits, including OpenAI CEO Sam Altman. This person publicly complained concerning the lengthy delay before eventually receiving a refund. Original Design Reportedly Abandoned.
More recent reports suggest Tesla may have completely abandoned the Roadster design first shown in 2017.
In practice, the firm is reportedly preparing a significantly different vehicle, potentially explaining why development has taken so long.
That means the Roadster shown on October 1 could look particularly different from the red prototype Tesla originally disclosed almost nine years ago. Elon Musk Becomes World's First Trillionaire After SpaceX IPO. Production is Still Some Time Away. Even after the October reveal, buyers should not expect deliveries immediately.
Musk has previously remarked production could commence around 12 to 18 months after the final unveiling.
That would put actual production well into 2027 or even 2028 if Tesla maintains that timeline. Stay Connected with ProPakistani.
Obtain the latest tech news, telecom insights, and product launches wherever you prefer. Follow on Google Discover.
Add as a preferredSource on Google Follow on Google News Join WhatsApp.
Add ProPakistani to Preferred Sources and see more of our stories in Google Search and Top Stories. KP Launches Pishtakhara Underpass Project Sep 14, 2026 4: 23 pm.
For now, tesla Finally Revealing Second remains the part of the story worth watching, and further updates are likely as more details are confirmed.



